Mobile
Log In Sign Up
Home > chinese-english > "heating area" in English

English translation for "heating area"

加热面积
受热面积
Example Sentences:
1.Analyzing on the choice of smoke flow speed and the heated area ash and wear
浅析烟气流速的选择与受热面积灰和磨损
2.Electrically heated area rugs
电热区毯
3.The main roller is of direct - heating mode , which makes the effective heating area exceed 75 % and increases the energy utilization
直热式主辊筒,有效加热面积超过了75 % ,提高了能源的利用率。
4.There is a hook on the two ends of heating area , you need only to hood the spring after round the band on compressor when install
电加热带线在加热区两端装配有弹簧挂钩,装配时将电加热带线环绕在压缩机上,扣上弹簧即可。
5.The difference of heated area between tubes is very small , so the thermal deviation mainly results from inhomogeneous endotherm and flux
但由于管子毛间的受热面积差异很小,过热器的热偏差主要由于吸热不均匀和流量不均匀造成。
6.The arabic dry heat area for adapts the local climate , reflected the region environment and the culture , and constituted the unique architecture space and the shape
阿拉伯干热地区为适应当地的气候、反映地域环境与文化,构成了较独特的建筑空间与形态。
7.50mm polyurethane foam steam heating system : external steam channels are weld to the tank underside to give an effective surface heating area of 8 . 0 sq . m . the steam inlet / outlet connections are 11 / 2 inch bsp male
目前中国是世界上最大的黄磷出口国,为与国际运输业接轨,罐式集装箱对我国磷化工产品的贮运是十分必要的。
8.The company adopts hot - water boiler and steam boiler , introducing into wet dust catcher , scrape - board removing ash machine and water disposing facility , and heating area achieves 140 , 000 square meters , and all kinds of index arrives desire of environmental protection department
公司采用热水式锅炉和蒸汽锅炉相结合,引进湿式除尘器、刮板除灰机及水处理设备,供暖面积约14万平方米,各项指标均达到环保部门的要求。
9.Specification of three - cavity glass vacuumsolar energy collecting tubeadding one more complete glass tube in the normal tube , raising the heating efficiency by decreasing the watercontent , not the heating area . the heating efficiency canimprove 30 % by this way
三腔全玻璃真空集热管在普通全玻璃真空集热管或三高真空集热管内增加一支全封闭的玻璃管,不减少采光面积而减少水容量从而提高升温效率,升温效率比普通全玻璃真空管提高30 %左右。
10.The original design was intermediate vapor 42t / h , but the actual output is 30 - 35t / h , at the same time the temperature and pressure of the vapor are unstable , it affects the economic efficiency , the reason were the collecting dust on the heat area and serious corrision , they led to the decrease of the boiler load , and need stop to washing the dust , the article deals with the reform of the exhaust gas boiler , at the basic of the design condition , after thermo calculation , flute gas , resistence calculationand strenth calculation , the structure of the heat surface had been rearranged , then the proof calculation was done
原设计产中压蒸汽42吨时,但投运后只产30 - 35吨时,并且蒸汽温度和压力均不稳定,影响到经济效益。其原因是受热面积灰和腐蚀严重,影响传热使锅炉负荷下降,不能长时间运行,需停产清理积灰。本论文针对此余热锅炉的技术改造,在给定设计条件基础上,通过热力计算,烟气阻力计算和强度计算,对锅炉受热面结构重新布置,然后再作校核计算。
Similar Words:
"heating apparatus" English translation, "heating apparatus, electric" English translation, "heating appliance" English translation, "heating appliances in general" English translation, "heating appratus" English translation, "heating arrangement" English translation, "heating attachment" English translation, "heating barrel" English translation, "heating bath" English translation, "heating battery" English translation